Sequencer Form

This sequence will begin the brew process at 6:00 AM on the Twelfth of December. It turns on the pump then sets the temperature of the three tuns. Then at 6:01 it turns on the Mash heat. At 6:15 it turns on the liquor and finally the boiler at 6:20 AM.

Sequences can be saved and recalled. The 'Action' drop down box contains a list of all the brew process operations