Up Amateur Radio » M46 Tower Project » Fabrication » Loos Tension Gauge Prev Next Slideshow

 Previous image  Next image  Index page
 
 
 
 
CIMG0188
  CIMG0189.JPG - After completion I calibrated them by connecting 5/15" EHS between two trees with a chainfall.  I then put all three gauges on the wire stand and calibrated my gauges wrt the factory Loos.  
CIMG0190
CIMG0191
CIMG0192
CIMG0193
CIMG0194

After completion I calibrated them by connecting 5/15" EHS between two trees with a chainfall. I then put all three gauges on the wire stand and calibrated my gauges wrt the factory Loos. Download
Image | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
Total images: 12 | Help